Architectural and Structural Compliance

Tiling

  • Check for CLEANLINESS of base surface. Has the loose mortar & debris been removed from the work area?
  • Have the preceding activities (fixing of doors, partitions, false ceiling, etc) been COMPLETED?
  • Check for PROVISION of service conduits, junction boxes, etc
  • Is the APPROVED PATTERN of LAYING available for reference?
  • Are SLOPES for the tiled surface finalized?
  • Check for availability of TILES & other construction aids
  • Check for availability of TILING MASONS
  • Is the MORTAR MIXING PROPORTION as specified?
  • Is the THICKNESS OF MORTAR BED acceptable?
  • Check for PATTERN of LAYING
  • Check for the THICKNESS of JOINTS between tiles
  • Check for TILING around doors, sanitary fittings, columns, partitions, etc
  • Check the FINISHING of EDGES for cut tiles
  • Check for the ADDITION of PIGMENT to cement, if required
  • Check for CURING OF TILING for the specified period
  • Check for CLEANING of tile surface
  • Check for GRINDING & POLISHING
  • Final check for TRUE LEVEL SURFACE, PATTERN, SURFACE FINISHES, SLOPE, etc

Painting

  • Are the MANUFACTURER’S SPECIFICATIONS for painting available for reference?
  • Check for AVAILABILITY of APPROVED SHADE DETAILS
  • Check for cleaning of WALL & CEILING. Is it free from dead mortar, dirt, dust, algae, grease, etc?
  • Check for FILLING OF PITS or UNDULATIONS in the PLASTER
  • Check for SUITABILITY & SAFETY of scaffolding
  • Is the SCAFFOLDING erected away from the surface so as to protect the surface from being painted?
  • Check for AVAILABILITY of sufficient number of plastic emulsion containers
  • Check for availability of PAINTING GROUPS
  • Check for PRIMER APPLICATION
  • Is the PROPORTION of PAINT & WATER MIX as per manufacturer’s specifications?
  • Check for the CONSISTENCY of PAINT
  • Check for UNIFORM APPLICATION of PAINT
  • Check the NUMBER OF COATS
  • Check the INTERVAL TIME between two coats
  • Check for REMOVAL of scaffolds & cleaning

Door & Windows

  • Check for plumb for the doorframe w.r.t. MASONRY OPENING
  • Check for plumb for the doorframe w.r.t. MASONRY OPENING
  • Check for PLASTERING of WINDOW FRAMES to walls by screws
  • Check for DIMENSIONS OF JAMBS & REVEALS
  • Final check for PAINT, SURFACE FINISHES & GLAZING
  • Check for REMOVAL of protective coating & cleaning of the aluminum door before handover

Frame Arrangement

  • We design the structure / frame arrangement based on the requirement and ensure that it’s aesthetic in nature.

Design requirements

  • We design structural elements depending on the loads & design them keeping economy and elegance in mind, guaranteeing a safe, serviceable and durable structure.

IS Codes

  • Structural elements are designed as per relevant Indian Standard Codes

Structural expertise

  • The structural detailing is done with expertise using the latest architectural software focusing precisely on safety while designing the framed structure.

Structural reports

  • We work on the structure based on the soil test reports, which ensures the stability of the structure along with its longevity.